Telephone 07766 651001 or Contact Us

Health & Safety

Ward Hall - Xaverian College

This project comprised the construction of a new three storey school extension and link connection to existing buildings. The new build includes foundations, structural frames and floors, staircases, external facades, glazing, internal partitions and internal fit out with data, mechanical and electrical installation, passenger lift and fire alarm, required by any modern 6th form college.

Works also include refurbishment of the existing building at the link, in addition to the remodelling of existing accommodation to provide improvements to access, security and useable space.

Heaton Moor Medical

Green Project Management is part of the team responsible for the refurbishment of Heaton Moor Medical Centre. This project involved providing CMD-C services for the refurbishment of the existing church hall and associated buildings along with alterations to the existing surgery including local demolition of existing walls, removal of asbestos and treatment of wet rot. The project also involved the creation of new access with a modren GP surgery fit out.

Pages

Subscribe to RSS - Health & Safety